“Connected” means two things here: fiber diverse enough that no single provider is a single point of failure, and part of a broader platform instead of a one-off site. Both are what actually future-proofs a campus.
A connected campus is one built with redundancy and room to grow already designed in. It is not a single building sized to today’s requirements, but a site, and often a family of sites, with enough fiber diversity, land, and power headroom to become the next phase without starting over.
That distinction matters more than it sounds like it should, because most of the constraints that make a campus hard to expand later get locked in during site selection, long before anyone breaks ground.
Connected to what: fiber diversity as day-one infrastructure
Project Appaloosa [ADD LINK] sits within three miles of six major fiber providers. Project Washington [ADD LINK] has dual redundant fiber routes and sits within two miles of fiber, built for the low-latency connectivity hyperscale AI workloads actually need. Project Mustang [ADD LINK] has four major fiber providers of its own. None of that is incidental. Fiber access has to be evaluated at the same stage as power and land, because a campus with one fiber provider has a single point of failure baked into its foundation, no matter how well the power side is designed.
That’s why fiber sits alongside power, land, water, workforce, and permitting as one of the factors we screen a market against before committing to a site, not something evaluated after the fact. A market can clear every other bar and still be the wrong choice if it can’t offer real fiber redundancy. These six factors have to clear together, or the site isn’t actually ready.
Connected to what comes next: designing for Phase 2 before Phase 1 is finished
Both Appaloosa and Washington are laid out as conceptual 10-building powered-shell campuses, and Mustang’s master plan illustrates the same idea: phased development against a scalable expansion, not a fixed footprint.
Land, power capacity, and fiber contracts get sized for the full build-out from the start, even though construction happens in stages. The alternative, e.g., designing only for phase one, usually means renegotiating land, power, or connectivity when the second phase actually needs them, on a timeline the customer didn’t agree to.
Connected to the rest of the portfolio
One good site is a project. A handful of connected sites in the same market is a platform, and platforms are what let a customer scale with us instead of just occupying space. That’s the thinking behind our connected-campus strategy in the Austin market [ADD LINK], developing Appaloosa and Mustang together rather than as unrelated projects. It creates shared procurement efficiency, more negotiating leverage with partners, and long-term flexibility for a customer whose needs outgrow a single campus.
It also changes the conversation with a customer. A single-site developer can offer you a building. A platform can offer you a market, which provides room to expand into a second or third campus without starting the site-selection process over from scratch – with a partner who already knows the power, fiber, and permitting landscape there. A site is a starting point. What we’re actually building is the platform around it.
Frequently asked questions
What makes a data center campus “connected”?
Two things: diverse, redundant fiber connectivity so no single provider is a point of failure, and inclusion in a broader multi-site platform rather than being developed as a standalone project.
Why does fiber provider diversity matter for site selection?
A campus with only one fiber provider carries a single point of failure regardless of how reliable its power supply is — evaluating fiber access alongside power, land, water, workforce, and permitting [ADD LINK to Solutions] during site selection avoids that risk.
What is a connected-campus strategy?
Developing multiple sites within the same market together, rather than as unrelated one-off projects, to create shared procurement efficiency, greater scale, and long-term flexibility for customers.
How does Big Watt design campuses for future growth?
By master-planning for the full build-out — land, power, and fiber capacity — from the start, even when construction happens in phases, so a later phase doesn’t require renegotiating what the first phase already secured.